Approved Document M

PART M

Part M Building Regulations cover: Access to and use of buildings – References from document:

For buildings other than dwellings

  • all stair nosings are made apparent by means of a permanently contrasting material 55mm wide on both the tread and the riser;

All communal Stairs

  • The principal communal stair that gives access to the dwelling should meet the provisions of Part K for general access stair
  • Stairs and ramps: Approved Document K (Protection from falling, collision and impact) contains guidance on internal and external steps, stairs and ramps when they are part of the building. Additional guidance is provided in this Approved Document when external stepped and ramped access also form part of the principal entrances and alternative accessible entrances, and when they form part of the access route to the building from the boundary of the site and car parking.

Suitable tread nosings

  • Stair nosings that conform with one of the options shown in Approved Document K

All Quantum Flooring Accessories productions are designed with Part M compliance in mind – look out for the best practice logo.

To learn more visits Quantum Floorings page on RIBA CPD and book in an online or in person CPD session https://quantumprofilesystems.com/quantum-flooring-accessories/book-a-riba-cpd/

For more information tailored to your specific project needs, reach out today! Call us at 0161 627 4222 or email [email protected]. Explore our useful links below:

 

  1. Product Selector https://quantumprofilesystems.com/quantum-flooring-accessories/easy-product-search/
  2. 24-hour samples https://quantumprofilesystems.com/quantum-flooring-accessories/request-sample/
  3. NBS Specification https://quantumprofilesystems.com/quantum-flooring-accessories/nbs-specifications/
  4. BIM Objects https://quantumprofilesystems.com/quantum-flooring-accessories/bim-objects/

 

We’re here to support your project every step of the way. #quantumflooring

Next in Question and Answer...

Light Reflectance values to meet Building Regulations.

Designers can swiftly and accurately specify products with just one click.

Choose the samples you need & order before 3pm for next day delivery.

Have a technical question?